As a Minority Business Development Agency (MBDA) Business Center, we often get calls from PRIME contractors looking for subcontractors. We compiled this list to help showcase bidding opportunities. Please APPLY now.

Be the contractor of the project below

(1) Prime Vendor: Palm Engineering Construction Company Inc.

Bid Project: Maple Canyon Restoration Phase 1 & 2

Due Date: December 6, 2022 at 2:00 PM (PDT)

Project Detail:

NAICS codes: CLICK HERE

20221020085117788 K-23-2030-DBB-3 – FINAL Solicitation.pdf

20221020085130088 K-23-2030-DBB-3 -PLANS 38321-01-D thru 38321-108-D Phase 1 Signed.pdf

20221020085138661 K-23-2030-DBB-3 -PLANS 37272-01-D thru 37272-40-D Phase 2 Signed.pdf

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with Palm Engineering Construction Company Inc., please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(2) Prime Vendor: Flatiron West, Inc.

Bid Project: Construction Aux. lane, compaction grouting, RHMA, landscape, & electrical

Due Date: December 7, 2022 at 2:00 PM (PDT)

Project Detail: CLICK HERE

Response Sheet: MBDA Client enrollment form If you are interested in bidding with Flatiron West, Inc., please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(3) Prime Vendor: Stantec Consulting Services Inc.

Bid Project: Pure Water San Diego – Phase 2 (H2226024)

Due Date: December 8, 2022 at 2:00 PM (PDT)

Project Detail: CLICK HERE

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with Stantec Consulting Services Inc., please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(4) Prime Vendor: Griffith-Atkinson Joint Venture

Bid Project: SR 57/60 Interchange Improvements Project

Due Date: December 09, 2022 at 02:00 PM (PDT)

Project Detail:

Plans & Specs: CLICK HERE

Scope of Services: Constructing an eastbound on-ramp bypass lane from SR-60, constructing a new eastbound general purpose-lane on the mainline, reconfiguring Grand Avenue westbound on-ramp and eastbound on- and off-ramps, replacing the existing Grand Avenue overcrossing, constructing an eastbound SR-60 off-ramp bypass from the northbound split, and reconstructing the eastbound SR-60 Diamond Bar Blvd on-ramp.

Estimating Team:

Jake Weigand / Ky Mcleod / Tristan Holtz / Jeremie Corpuz / Jose Sollano / Geoffrey Lister

jweigand@griffithcompany.net / kmcleod@griffithcompany.net / tholtz@griffithcompany.net / jeremie.corpuz@atkn.com / jose.sollano@atkn.com / geoffry.lister@atkn.com

Quotes for Services and Supplies requested for the following bid including, but not limited to:  Gate Valve, Plastic Pipe, Remote Control Valve, Corrugated Steel Pipe, Welded Steel Pipe Conduit, Cast-In-Drilled-Hole Concrete Piling, Cast-In-Drilled-Hole Concrete Piling, Irrigation Controller, Galvanized Steel Pipe, Alternative Flared End Section, Temp. Culvert, Abandon Culvert, Abandon Inlet, Abandon Manhole, Abandon Sewer, Access Gate, Additional Hazardous/Contaminated Material, Additional Permanent Erosion Control Establishment  Work, Additional Utility Work, Adjust Inlet Remove Concrete, Adjust Manhole Frame And Cover, Alternative In-Line Terminal System, Alternative Temp. Crash Cushion, Anit-Graffiti, Asbestos Compliance Plan, Asphalt Binder, Asphalt Waterproofing Membrane, Austin Vault Sand Filter 22500 Wqv, Bar Reinforcing Steel , Barrier Diamond Texture, Barrier Slab, Base Bond Breaker Prime Coat, Bird Protection, Bmp Install, Booster Pump, Bridge Deck Drainage System, Bridge Monitoring Column Casing, Bridge Removal, Building Survey, Buried Man-Made Objects, Cable Railing Transition Railing , Camera Systems, Cap Inlet, Cement Treated Permeable Base, Chain Link Fence, Channelizer (Surface Mounted), Check & Test Existing Irrigation Facilities, City Entry Monument, Class 3 Aggregate Base , Class 3 Permeable Material , Clean Expansion Joint, Clearing And Grubbing , Concrete Pavement, Cold Milling, Cold Plane Asphalt , Compost, Concrete (Channel Lining), Concrete Barrier, Concrete Smoothness Incentive, Construction Area Signs, Contractor-Supplied Biologist (Day), Corrugated Steel Pipe Riser, Crash Cushion, Decorative Steel Fence (Bridge), Design Changes, Ditch Excavation, Double Midwest Guardrail System (Wood Post), Dpp Infiltration Area (Rock Fill), Drainage Inlet Marker, Drill And Bond, Drilling, Cast-In-Steel Shell Concrete Pile, Drive Steel Pile, Driven Pile, Drop Manhole, Dust Control, Dust Palliative, Electric Service For Irrigation, Electrical, End Anchor Assembly, End Cap, Enhanced Aesthetics Texture, Fence / Mbgr, Fiber Optic Cable Systems, Filter Fabric, Finishing Roadway, Flashing Arrow Sign, Fractured Rib Texture, Cast-In-Steel Shell Concrete Piling, Steel Pipe Piling, Furnish Formed Panel Sign, Furnish Laminated Panel Sign, Furnish Sign Structure, Furnish Single Sheet Aluminum Sign, Furnish Steel Piling, Geocomposite Drain, Geomembrane (Water Barrier), Geosynthetic Filter Fabric, Geosynthetic Pavement Interlayer (Paving Fabric), Geosynthetic Reinforcing Fabric, Grated Line Drain, Ground Anchor (Vertical), Ground Monitoring, Guard Railing Delineator, Hot Mix Asphalt, Hydromulch Hydroseed, Hydroseed, Imported Borrow, Incorporate Materials, Inertial Profiling, Install Sign Structure, Invasive Species Control, Iron Sulfate , Isolation Casing, Reinforced Concrete Pipe, Job Site Management, Joint Seal , Jointed Plain Concrete Pavement, Lead Compliance Plan, Lean Concrete Backfill, Lean Concrete Base, Lighting (City Street), Lighting System, Lightweight Cellular Concrete, Maintain Existing & Temp. Electrical Systems, Maintain Existing Planted Areas, Maintaining Existing Traffic Management System Elements During Construction, Manholes, Masonry, Mechanically Stabilized Embankment, Midwest Guardrail System (Wood Post), Minor Concrete, Curb & Gutter, Misc. Iron & Steel, Misc. Metal, Modifying Automatic Vehicle Classification Stations, Modifying Lighting Systems, Modifying Ramp Metering Systems, Modifying Signal & Lighting Systems, Natural Resource Protection Plan, Noise Monitoring, Nonshrink Hydraulic-Cement Grout, Object Marker, Operate Existing Irrigation Facilities, Packet Fertilizer, Paint Traffic Stripe, Paleontological Resources, Pavement Marker, Paving Notch Extension, Permanent Erosion Control Establishment Work, Pervious Backfill Material, Pilaster, Pilaster Diamond Texture, Place Hot Mix Asphalt, Place Hot Mix Asphalt Dike, Planting, Plastic Pipe, Plastic Traffic Drums, Pop-Up Sprinkler Assembly, Portable Changeable Message Sign, Portable Radar Speed Feedback Sign, Pre/Post Construction Surveys, Prefabricated Vertical Drain, Prepare Storm Water Pollution Prevention Plan, Prestressing Cast-In-Place Concrete, Progress Schedule (Critical Path Method), Quality Control, Reinforced Concrete Pipe, Relocate Roadside Sign, Remove Asphalt Concrete Dike, Remove Asphalt Concrete Pavement, Remove Base & Surfacing, Remove Bridge Mounted Sign, Remove Concrete, Concrete Barrier &  Concrete Pavement, Remove Crash Cushion, Remove Flared End Section, Remove Grated Line Drain, Remove Guardrail, Remove Headwall, Remove Inlet, Remove Irrigation Facility, Remove Painted Pavement Marking, Remove Painted Traffic Stripe, Remove Pavement Marker Delineator, Remove Reinforced Concrete Box Culvert, Remove Retaining Wall , Remove Roadside Sign, Remove Sign Structure, Remove Sign Structure Walkway, Remove Slope Paving , Remove Sound Wall, Remove Thermoplastic Pavement Marking, Remove Thermoplastic Traffic Stripe, Remove Yellow Painted Pavement Marking (Hazardous Waste), Remove Yellow Painted Traffic Stripe (Hazardous Waste), Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Retaining Wall, Right Of Way Obligations, Riser Sprinkler Assembly, Roadside Sign, Roadway Excavation, Rock Blanket, Rock Slope Protection, Rock Slope Protection Fabric, Rubberized Hot Mix Asphalt, Sand Backfill, Sawcutting, Schedule, Seal Course Concrete, Sign Illumination System, Slope Paving (Concrete), Slotted Plastic Pipe Underdrain, Slow-Release Fertilizer, Soil Amendment, Soil Testing, Sound Wall (Masonry Block), Stationary Impact Attenuator Vehicle, Stone Columns, Storm Water Annual Report, Storm Water Sampling & Analysis Day, Street Sweeping, Striping, Structural Concrete, Structure Backfill, Structure Excavation, Tack Coat, Temp. Concrete Washout, Temp. Construction Entrance, Temp. Cover Temp. Check Dam, Temp. Crash Cushion Module, Temp. Drainage Inlet Protection, Temp. Fence, Temp. Fiber Roll, Temp. Gravel Bag Berm, Temp. High-Visibility Fence, Temp. Hydraulic Mulch, Temp. Lighting Systems, Temp. Pavement Marking , Temp. Pedestrian Access Route, Temp. Radar Speed Feedback Sign System, Temp. Railing (Type K), Temp. Silt Fence, Temp. Terminal Section , Temp. Traffic Screen, Temp. Traffic Stripe (Paint), Thermoplastic Pavement Marking, Thermoplastic Traffic Stripe, Time-Related Overhead (Wday), Tow Truck Service, Traffic Control, Trash Enclosures, Treated Wood Waste Dewatering (Contaminated Groundwater), Tree Well Sprinkler Assembly Riser Sprinkler Assembly, Trench Paving, Trucking, Tubular Handrailing, Tubular Steel Fence, Type Ii Barricade, Underground (Wet), Unsuitable Materials, Vcp Sewer 1, Vibration Monitoring, Welded Steel Pipe Casing (Bridge), Wood Mulch.

Location: Brea, CA

<STEP1>

Sub-Contractor Response Sheet:

If you are interested in bidding with Griffith-Atkinson Joint Venture, please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org

<STEP2>

Contact Information:

Griffith-Atkinson Jv

(714) 984-5500 · 3050 E Birch St, Brea, CA 92821   


(5) Prime Vendor: GUY F. ATKINSON CONSTRUCTION, LLC

Bid Project:

San Gabriel Valley Council of Governments SR 57/60 INTERCHANGE IMPROVEMENTS PROJECT

Due Date: December 09, 2022 at 2:00 PM (PDT)

Project Detail: CLICK HERE

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with GUY F. ATKINSON CONSTRUCTION, LLC, please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(6) Prime Vendor: STEVE P. RADOS, INC.

Bid Project:

San Gabriel Valley Council of Government 22-13 – SR57/60 Interchange Improvements Project

Due Date: December 09, 2022 at 02:00 PM (PDT)

Project Detail: CLICK HERE

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with STEVE P. RADOS, INC., please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(7) Prime Vendor: Riverside Construction Company, Inc

Bid Project: Construction on State Highway in Riverside County near Lake Elsinore at Morrill Canyon Bridge and near Hemet at Strawberry Creek Bridge

Due Date: December 14, 2022 at 12:00 PM (PDT)

Project Detail: CLICK HERE

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with Riverside Construction Company, Inc, please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(8) Prime Vendor: John Madonna Construction Co., Inc. 

Bid Project: CT 05-1H8104 Route 25 Excavation, HMA, Culverts and Signal System, San Benito County, CA

Due Date: December 14, 2022 at 2:00 PM (PDT)

Project Detail: CLICK HERE

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with John Madonna Construction Co., Inc., please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(9) Prime Vendor: Griffith Company

Bid Project: Construction-Los Angeles Union Station Forecourt and Esplanade Improvements

Due Date: December 15, 2022 at 02:00 PM (PDT)

Project Detail: CLICK HERE

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with Griffith Company, please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(10) Prime Vendor: RTA Construction, Inc.

Bid Project:

Lewiston Community Services District Water Distribution System Replacement Project in Lewiston, CA

Due Date: December 15, 2022 at 02:00 PM (PDT)

Project Detail: Click HERE

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with RTA Construction, Inc., please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(11) Prime Vendor: California Trenchless, Inc

Bid Project: Water Distribution System Replacement Project

Due Date: December 15, 2022 at 03:00 PM (PDT)

Project Detail: CLICK HERE

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with California Trenchless, Inc., please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(12) Prime Vendor: Griffith Company

Bid Project:

Construction on State Highway in Orange County at Various Locations on Route 5, 55, 73, 91, 133, 405

Due Date: December 15, 2022 at 02:00 PM (PDT)

Project Detail: CLICK HERE

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with Griffith Company, please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(13) Prime Vendor: W.A. Rasic Construction

Bid Project:

City of San Diego
Montezuma/Mid-City Pipeline Phase 2 and
70th Alvarado to Saranac Sidewalk

Due Date: December 15, 2022 at 02:00 PM (PDT)

Project Detail:

W.A. Rasic is requesting bids for the following trades and/or material supplies:
Welded steel pipe supply, Waterworks supply, Tunneling, Annular grout, Electrical/instrumentation,
Permeation grouting, Minor concrete, Asphalt paving, Asphalt cold milling, Sawcutting, Cathodic
protection, Welding, Trucking and disposal, Chlorination/de-chlorination, Geotechnical instrumentation/monitoring, Asbestos pipe removal/disposal, Fiber optic conduit, Landscaping/tree
removal, Traffic signal, Traffic striping, Traffic control, Sewer bypass, Paleontological monitoring,
Archeological monitoring, Native American monitoring, Survey, Street sweeping, Community liaison,
SWPPP, Waterline Relocation, Metals supply, Reinforcing steel, Ready mix concrete, Aggregate supply
Plans and Specifications are available at no cost to interested firms by contacting W.A. Rasic Construction
during normal working hours of 8:00 am – 5:00 pm Monday thru Friday or by downloading from the City
of San Diego’s Planet Bids Portal.
W.A. Rasic will assist in obtaining bonds, lines of credit, insurance, equipment, supplies and materials
upon request. W.A. Rasic will consider each SLBE, ELBE quote, including those that are broken down
into economically feasible units as well as arrange delivery schedules to facilitate and encourage maximum bidding participation. W.A. Rasic also encourages a consortium of SLBE and ELBE firms when a contract potion is too large to handle individually. Subcontractors must have a valid California Contractors License and must be registered with the Department of Industrial Relations (DIR) as required by Section 1725.5 of the Public Contract Code. Subcontractors will be required to execute W.A Rasic’s standard subcontract agreement and general insurance requirements. A copy of our subcontractor agreement and insurance requirements is available in electronic format upon request. W.A. Rasic reserves the right to require each subcontractor to provide payment and performance bonds in the amount of 100% of the subcontractors bid. Bond Premium will be reimbursed up to a cost not to exceed 2.5%. W.A. Rasic is an equal opportunity employer and Union signatory Contractor.

Location: Long Beach, CA

<STEP1>

Sub-Contractor Response Sheet:

If you are interested in bidding with W.A. Rasic Construction, please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org

<STEP2>

Contact Information:

4150 Long Beach Boulevard, Long Beach, CA 90807 • 562-928-6111 • fax: 562-928-7339 www.warasic.com

Senior Estimator: Ben Sebat Phone: (562) 928-6111 Email: bsebat@warasic.com


(14) Prime Vendor: W.A. Rasic Construction

Bid Project:

Los Angeles Department of Water & Power
Western Trunk Line Project – Phase 1

Due Date: December 15, 2022 at 02:00 PM (PDT)

Project Detail:

W.A. Rasic is requesting bids for the following trades and/or material supplies:
Materials: Steel Pipe, Kubota Pipe, Waterworks Supply (Valves, Flow Meter, Appurtenances), Ready Mix
Supply (Concrete, Slurry), Aggregate Supply (Asphalt, Base), Precast Concrete (Vaults, Shafts)
Professional: Shoring Engineering, SWPPP Plan, Geotechnical Instrumentation & Monitoring, Inspection
Services, Survey
Supplies: Traffic Control Equipment, Shoring Equipment, Field Offices, Tunneling Equipment
Subcontractors: Trucking & Disposal, Sawcutting, Grind & Cap Asphalt Paving, Striping, Minor
Concrete (Sidewalk & Curb), Ground Treatment for Tunnel, Tunneling, Shafts, Cathodic Protection,
Pipeline Disinfection, Electrical / Instrumentation
Plans and Specifications are available at no cost to interested firms by contacting W.A. Rasic Construction during normal working hours of 8:00 am – 5:00 pm Monday thru Friday.
W.A. Rasic will assist in obtaining bonds, lines of credit, insurance, equipment, supplies and materials
upon request. W.A. Rasic will consider each DBE, MBE, WBE, and OBE quote, including those that are
broken down into economically feasible units as well as arrange delivery schedules to facilitate and
encourage maximum bidding participation. W.A. Rasic also encourages a consortium of DBE / MBE /
WBE firms when a contract potion is too large to handle individually. Subcontractors must have a valid
California Contractors License and must be registered with the Department of Industrial Relations (DIR) as
required by Section 1725.5 of the Public Contract Code. Subcontractors will be required to execute W.A
Rasic’s standard subcontract agreement and general insurance requirements. A copy of our subcontractor
agreement and insurance requirements is available in electronic format upon request. W.A. Rasic reserves
the right to require each subcontractor to provide payment and performance bonds in the amount of 100% of the subcontractors bid. Bond Premium will be reimbursed up to a cost not to exceed 2.5%. W.A. Rasic is an equal opportunity employer and Union signatory Contractor.

Location: Long Beach, CA

<STEP1>

Sub-Contractor Response Sheet:

If you are interested in bidding with W.A. Rasic Construction, please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org

<STEP2>

Contact Information:

4150 Long Beach Boulevard, Long Beach, CA 90807 • 562-928-6111 • fax: 562-928-7339 www.warasic.com

Senior Estimator: Mark Setzer Phone: (562) 928-6111 Email: msetzer@warasic.com

Attn: Angel Samz Fax: (562) 928-7339 || Email: asamz@warasic.com


(15) Prime Vendor: RTA Construction, Inc.

Bid Project:

LEWISTON COMMUNITY SERVICES DISTRICT, LEWISTON, CA WELL 8 PROJECT

Due Date: December 22, 2022 at 02:00 PM (PDT)

Project Detail: CLICK HERE

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with RTA Construction, Inc., please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(16) Prime Vendor: Palm Engineering Construction Company Inc.

Bid Project: Logan Heights LID (South) project in San Diego

Due Date: January 10, 2023 at 02:00 PM (PDT)

Project Detail:

Bid-Items-Logan-Heights

List-of-NAICS

Logan-Heights-Lid-South-FINAL-Solicitation-Document.pdf

Plans and Specs

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with Palm Engineering Construction Company Inc., please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(17) Prime Vendor: W.A. Rasic Construction

Bid Project:

Inland Empire Utilities Agency
Carbon Canyon Water Recycling Facility (CCWRF)
Asset Management and Improvements Project

Due Date: January 10, 2022 at 02:00 PM (PDT)

Project Detail: CLICK HERE

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with W.A. Rasic Construction, please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(18) Prime Vendor: WEST COAST GENERAL GROUP

Bid Project: Logan Heights LID

Due Date: January 10, 2022 at 02:00 PM (PDT)

Project Detail: CLICK HERE

Sub-Contractor Response Sheet: MBDA Client enrollment form If you are interested in bidding with WEST COAST GENERAL GROUP, please submit the MBDA Client enrollment form to Procurement Manager, Andrew Barrera at abarrera@pacela.org


(19) Prime Vendor: Miller Equipment Company, Inc

Bid Project: 2023 Santa Fe Shoulder Improvements Los Angeles Ave To GalpinST [ENG2023-01

Due Date: January 13, 2022 at 11:00 AM (PDT)

Project Detail: CLICK HERE